A consultant’s trial period in a French IT firm: length and exit

Four months for a Syntec manager, renewable once, two or three for other staff. Ending a trial when a mission falls through risks an abusive termination claim.

10 min read

A consultant’s trial period in a French IT services firm (an ESN, the French term for a consulting and staffing firm that places engineers with clients) depends on their category under the Syntec collective agreement: four months at most for an engineer or manager, renewable once for four months, and two or three months for ETAM staff depending on their coefficient, renewable for the same length. Renewal has to be written into the contract and accepted in writing, and ending the trial, free in form, comes with a notice period that reaches six weeks after six months of presence.

The rule that matters most to a consulting firm is not a duration, though. The trial period exists to assess the employee’s skills, and ending it because a client gave up the mission the consultant was hired for is a reason that has nothing to do with the person. It is the most common use of the trial in this trade, and it is the one judges sanction.

What follows is general information on the law as it stands on 26 October 2026, not legal advice: a specific case should be checked with a French employment lawyer.

How long is a consultant’s trial period in a French IT firm?

The French Labour Code sets ceilings, in articles L1221-19 to L1221-26, and the Syntec agreement (technical consultancies and engineering firms, IDCC 1486, the branch agreement most IT services firms apply) sets the durations that actually apply in the sector. Its article 3.4, rewritten by amendment no. 46 of 16 July 2021 and extended to the whole branch by an order of 5 April 2023, provides for the following.

Syntec category Maximum initial period Maximum renewal Total Legal ceiling on the total
ETAM, coefficients 240 to 250 2 months 2 months 4 4 months
ETAM, coefficients 275 to 500 3 months 3 months 6 6 months
Engineers and managers, coef. 95 to 270 4 months 4 months 8 8 months

ETAM stands for employés, techniciens et agents de maîtrise, every non-management grade; the coefficient is the grade’s number in the agreement’s classification. One point on the first band, because the sources do not all agree. The text in force on Légifrance still reads “230 to 250”, with a note referring to amendment no. 2 of 27 October 2022 and saying it should read 240. Several online guides also repeat older durations, one month for some ETAM staff or three months for managers, which come from the wording before 2021 and no longer apply.

These durations are maximums. The contract can set less, and the trial period itself is optional: article L1221-23 says it “is not presumed” and must be “expressly stipulated” in the offer letter or the contract. An offer that says nothing about it, followed by a signed contract that adds one, creates a dispute no firm wants. A last case that comes up often in this trade: a final-year intern hired within three months has the length of the internship deducted from the trial, by half at most, and in full if they take the same job they held as an intern (article L1221-24).

Under what conditions can the trial period be renewed?

Three cumulative conditions, and the Syntec agreement adds a fourth that changes the tone. Article L1221-21 allows a single renewal only if an extended branch agreement provides for it; the contract must expressly mention that possibility; and the employee must agree in writing, by letter or email, before the initial period ends. A renewal offered the day after the deadline does not exist, and the employee is then hired for good.

Article 3.4 of the agreement adds that renewal “is exceptional” and must be agreed in writing by both the employee and the employer. The word carries no automatic penalty, but it reads badly against a firm that renews every trial as a matter of course, and an employment tribunal (the conseil de prud’hommes) will read it the same way. Service-public, the government’s official guidance site, also points out that an employer cannot set the full total from day one: you start with the initial period and renew afterwards, if there is a reason to.

In practice this means the decision to renew is taken around the middle of the initial period, while there is still time to discuss it with the consultant rather than hand them an amendment to sign the day before the deadline. A consultant asked for a signature with no explanation mostly understands that they are doubted, and they are more often than people think already interviewing elsewhere.

What notice must be given to end the trial?

Ending a trial period does not require a stated reason or the dismissal procedure, but it does require a notice period (délai de prévenance) that grows with time spent in the firm. The Syntec agreement is more generous to the employee than the law on both sides: the employer owes six weeks after six months, and the employee owes only twenty-four hours during their first month.

Time in the firm Employer, Syntec Employer, Labour Code Employee, Syntec Employee, Labour Code
Under 8 days 24 hours 24 hours 24 hours 24 hours
8 days to 1 month 48 hours 48 hours 24 hours 48 hours
Over 1 month to 3 months 2 weeks 2 weeks 48 hours 48 hours
Over 3 months to 6 months 1 month 1 month 48 hours 48 hours
Over 6 months to 8 months 6 weeks 1 month 48 hours 48 hours

The rule that catches firms out is article L1221-25: the trial period, renewal included, cannot be extended because of the notice period. A manager whose renewed trial ends in three weeks can no longer be given six weeks’ notice; the employer can still end the trial, but pays for the part of the notice that could not run, as compensation equal to the salary and benefits, paid leave included. The agreement adds that this compensation is not owed if the employee asks to be released from the notice and the employer agrees.

During the notice period, an employee whose trial is ended by the employer has two hours per working day to look for a job. When the employee is the one leaving, those hours are unpaid.

Can the trial be ended because the mission does not start?

It can, and it is the most exposed termination a consulting firm can decide. Article L1221-20 gives the trial a precise purpose: to let the employer assess the employee’s skills in their work, and to let the employee judge whether the job suits them. A termination that goes outside that purpose is an abuse of right, even though no reason had to be given.

The Cour de cassation, France’s highest court for civil and employment matters, ruled on a case very close to ours. In a judgment of 20 November 2007 (social chamber, no. 06-41.212), a business manager hired with a four-month trial had his contract ended while his position was being eliminated; the court of appeal found that the termination was for a reason not inherent to his person, and the Cour de cassation upheld that it was abusive, the trial period being intended to assess the employee’s professional worth. We have not found a Cour de cassation decision dealing specifically with a cancelled client mission, and we do not claim one exists.

The reasoning carries over without effort, though. A client abandoning a project, a lost tender or a start pushed back by three months are commercial events, which say nothing about the consultant’s skills. If the timeline shows the termination following the cancellation by a few days, the consultant needs no other evidence, and a letter citing “unsuitability for the role” without a single dated assessment does not contradict it.

The consequence is not reinstatement but damages for abusive termination, the amount depending on the harm. The real cost lies elsewhere: a consultant hired for a mission and let go when it falls through tells people, and the market for rare profiles is small. If the mission falls through and the consultant is good, the question is no longer the trial but the bench, which costs on average €5,480 a month per consultant and is handled as a scheduling problem.

What is a trial period spent on the bench worth?

Almost nothing as an assessment, and that is the opposite risk. A consultant hired without a mission, or whose start keeps slipping, can spend half the trial producing nothing a manager can judge. The firm reaches the deadline with no material, and the temptation is to renew “to see them on a mission”, which turns an exceptional renewal into a habit.

The remedy is to give the trial something to assess, even away from a client: an internal project, pre-sales work, a contribution to a tender response, training with a deliverable. Each produces something dated on which a technical lead can write two lines, and that is exactly what will be missing if the trial has to be ended or renewed. The bench does not pause the trial: it runs in calendar days like the rest of the time.

Absences, on the other hand, do pause it. Sick leave postpones the end of the trial by the exact length of the absence, unless the collective agreement says otherwise, and the employer cannot end the trial because of the illness itself, which would be discriminatory. While the contract is suspended after a workplace accident or an occupational disease, the trial cannot be ended at all, except for gross misconduct. A firm that counts the deadline from the hiring date without these postponements has the wrong date, sometimes in the direction that costs.

Which practices hold up before an employment tribunal?

They come down to three dates and one written record, and none of them is complicated. The first is the start: the contract states the length of the trial and the possibility of renewal, as article 3.4 requires, and the role’s assessment criteria are written down before day one, in the same way that a well-run intake meeting decides the placement before the first interview.

The second is the mid-point review, with the mission’s manager or, failing that, the technical lead, recorded in a few lines. That is the document that justifies a renewal, and it is also the one that protects a termination: a dated, reasoned assessment of skills weighs more than a well-turned letter. The third date is the decision, to be placed before the deadline minus the notice period, which means six weeks before the end for a manager past six months.

The written record, finally, is about what the trial is not. A trial period replaces neither checking references before the contract is signed nor the follow-up conversation that keeps a consultant. It runs both ways, and early departures are common: 30% of new joiners leave within the first six months, often during the trial and on the consultant’s initiative, with twenty-four or forty-eight hours’ notice. A three-month check-in that actually happens is worth more than a renewal signed in a hurry.

A trial deadline is the kind of date everyone knows and nobody carries, in between mission starts, roll-offs and tender responses. A calendar, an HR system or an agent can carry it and flag the mid-point review in time; the decision to keep, renew or end stays with a manager who has seen the work, and that is what a judge will examine. Then comes leaving after the trial, which follows other rules: for a Syntec manager, three months’ notice, and a handover to prepare during that time.

Frequently asked questions

  • How long is the trial period of a manager in a French IT firm under the Syntec agreement?

    Four months at most for engineers and managers, coefficients 95 to 270, renewable once for up to four months. The total therefore cannot exceed eight months, and the contract may set less.

  • Can the employer impose a renewal of the trial period?

    No. The renewal must be provided for in the contract or offer letter, permitted by the branch agreement, and accepted in writing by the employee during the initial period. The Syntec agreement requires written agreement from both parties and describes renewal as exceptional.

  • Can a firm end a consultant’s trial period because their mission was cancelled?

    It is risky. The trial period exists to assess the employee’s skills, and a termination decided for a reason that has nothing to do with the person, such as losing a client contract or eliminating a position, can be held abusive and give rise to damages.

  • Does sick leave extend the trial period?

    Yes. The end of the trial is postponed by the exact length of the absence, counted in calendar days unless a collective agreement says otherwise. The employer cannot end the trial because of the illness itself, which would be discriminatory.

Sources

  1. Légifrance, Syntec collective agreement (IDCC 1486), article 3.4 Trial period, extended version in force (in French)legifrance.gouv.fr
  2. Service-public.gouv.fr, Trial period of an employee on a permanent contract (checked 12 August 2026, in French)service-public.gouv.fr
  3. Code du travail numérique, article L1221-25 (employer’s notice period, in French)code.travail.gouv.fr
  4. Service-public.gouv.fr, Sick leave during the trial period (in French)service-public.gouv.fr
  5. Cour de cassation, social chamber, 20 November 2007, no. 06-41.212 (reproduced text, in French)dictionnaire-juridique.com